OYEAL Global
Dom> Blog> Kitchen and kitchen decoration kitchen decoration techniques and acceptance methods Daquan

Kitchen and kitchen decoration kitchen decoration techniques and acceptance methods Daquan

September 02, 2022

As people pay more and more attention to the quality of life, the design requirements for kitchen and bathroom have become more stringent. Therefore, the decoration of kitchens and bathrooms requires special attention to details. Once there is no waterproof or leak-proof work, it is easy to have “sequelae”. Leakage and leakage not only directly affect the home environment of the home, but also affect the relationship between the neighbors, but also cause fire safety hazards. So today Xiao Bian came to talk about kitchen and toilet decoration related skills and strategies and acceptance methods!

Kitchen decoration kitchen decoration design points

1. Choose a single light-colored wall tile for the wall surface

The color of the kitchenette should be bright, but avoid colorful. Do not use decorative materials with a stereoscopic pattern or contrasting contrast, otherwise the kitchen area will be visually narrow. In particular, the color arrangement on the wall should be dominated by white or light colors, and colors with excessive contrast should not be used.

2, the ground is simple and clean is the first choice

The plain floor will have obvious stains. Choosing a spotted or patterned floor will save the cleaning effort. The light floor will make the house brighter. The dark floor will make the house darker; the overly colorful patterns will make The screen is messy, so paving a simple floor in the kitchenette is always the right choice.

Kitchen decoration Raiders bathroom decoration Raiders

Let's talk about Sheung Shui: Consider how big your bathroom is, don't put a washing machine! Generally you want to stay:

1, a washing machine leader;

2, leaving one of the leading mops;

3, leaving two water heater inlet and outlet;

4, a toilet seat interface;

5. Two hot and cold water outlets in the wash basin, and then the water, two floor drain washers and one shower (you can use two floor drains if you are in trouble).

Kitchen and bathroom decoration skills

First, buy enough tiles at one time to avoid color differences

Tiles are the main materials necessary for kitchens and bathrooms. Tiles for decoration on the market today can be divided into floor tiles, wall tiles and waistline tiles according to their functions. There are many varieties of floor tiles, and there is plenty of room for selection. According to the material, it can be divided into glazed tiles, non-slip tiles and vitrified tiles. When selecting tiles, you can identify the quality of the tiles by checking the inspection reports provided by the merchants, certifications, etc. The reliability of the tiles is better than that of the tiles certified with 3C.

Second, recommend the use of furniture

As kitchen and bathroom renovations become more and more important, overall furniture is increasingly becoming mainstream. For most families, it is recommended to choose the whole cabinet or bath cabinet. Not only is the design of these furniture more reasonable, but the brand products are also more environmentally and securely controlled.


Kitchen and toilet decoration acceptance method

1, check the ventilation of the bathroom. Check if there is a vent reserved under the ceiling. If it is left on the ceiling, check with a flashlight to see if it has installability. Test the pumping force and check the toilet vent for construction waste with a flashlight. The bathroom is in the corridor. Windows should be equipped with security nets. If there are no windows, ventilation holes should be installed. The ventilation hole is 10 cm in diameter and is located below the suspended ceiling; the distance from the closest outlet to the ventilation hole should be 1.5 m and it is a waterproof socket.

2. Check the quality of toilets and baths in the bathroom, including checking whether there are cracks in bathroom toilets or baths, whether there are leakages in bathtubs, toilets, washbasins, etc. The cracks are sometimes as fine as hair and should be carefully observed; Look at whether the water is flowing smoothly, whether the sound of flushing is normal, whether the flushing water tank has leaked sound, and whether the tub, washbasin and the wall or cabinet are properly waterproofed.

3. Whether the floor of the bathroom is leaking. Some people in the bathroom upstairs bath, downstairs toilet may be a small rain, this is because the waterproof upstairs is not done, so when the acceptance of the toilet and upstairs to coordinate, do a good job of the closed water test .
The specific kitchen and toilet acceptance practice is to install sand in plastic bags upstairs and in their own toilets. All the floor drains will be completely plugged and then filled with water for 24 to 48 hours. There will be no leakage in the bathroom downstairs, indicating that the bathroom is not waterproof. Problems, so that waterproofing is considered acceptable.

4, closed water acceptance, closed water acceptance takes a long time, if the ground is found to be uneven water, floor water should be completely destroyed, re-do the water after laying the floor tiles, re-acceptance, until no water. Tung Yu decorated tips: Do not be afraid when accepting the bathroom, otherwise there will be toilet seepage problems after entering the house, and it will be more troublesome to solve. There is a balcony with water going down and it is better to check the closed water. The most intuitive way to check the kitchen is to look at the exhaust hole first. The diameter of the exhaust hole in the kitchen is not less than 15 cm. Home life can not be separated from the kitchen, cooking a good food, natural requirements for the kitchen is relatively high. Therefore, we must be more careful when accepting the kitchen.

5, look at the kitchen ventilation, kitchen ventilation window area is 1/10 of the use of the area, such as the kitchen room area of ​​10 square meters, then the opening of the window area should be 1 square meter. In addition, the kitchen exhaust hole diameter of 15 cm, can not be installed when it is not up to the acceptance of careful measurements.

6, in the acceptance of kitchenware, to see whether the cabinet body deformation, whether the closet door is firmly Zhou Zheng, whether the door can be smoothly opened and closed; kitchenware, tiles and the water pipe to carefully check whether the cement has not been glued, kitchen tiles have No loose looseness and unevenness, the kitchen flue need to use paper to fire smoke after the fire, placed in the mouth of the flue around 10 cm or so, to see if the smoke rises to the flue mouth and immediately turn away. If everything is not a problem, the kitchen bathroom will be considered as qualified.

About kitchen decoration techniques and acceptance methods are introduced here, I hope to help everyone. If you want to know more related information, you can pay attention to this website information.

Classic American kitchen decoration design pipeline acceptance woodwork acceptance doors and windows acceptance waterproof acceptance

Skontaktuj się z nami

Author:

Ms. christina

Phone/WhatsApp:

+8617761239672

Wszystkie produkty
You may also like
Related Categories

Wyślij je do tym dostawcy

Przedmiot:
Email:
wiadomość:

Your message must be betwwen 20-8000 characters

Skontaktuj się z nami

Author:

Ms. christina

Phone/WhatsApp:

+8617761239672

Wszystkie produkty

Dom

Product

Phone

O nas

Zapytanie

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Wysłać